2004 38M CONCORD
2004 38M CONCORD
Concrete Pump Details
2004 38m Concord on a 2004 Mack
Work done within last 4 months
New mud cups and differential seals
2 new reversing valves
Flow control valve
New hydraulic filters and filter oil
New air regulator to hydraulic oil tank
New change over valve
Rebuilt hopper, new front S tube busing new rear seals
Both new remixer shaft ends with new housings and bearings
New cutting ring
2 new auger motors (concord came with one additional one added)
New backsplash
Boom pump seals @ stibel
New swing out elbow
4 new E stops
4 new rear tires other 4 95%
Front tires 75%
Other work done within 2017
New brakes and 2 drums on rear
AC Eavaporator
Deck pipe
1 & 2 section boom new pipe
New tip hose
L/R Swing valve @ stack valve
Swing compensation valve mounted on pedestal
Boom to Accumulator valve @ stack valve
New wiring from all brain valves to control panel
Mono block holding valve @ boom 1
Mono block holding valve @ 3/4 (both)
Rollers in both ends of right front outrigger